Projects

Pacific Engineering Company performs offshore and onshore engineering surveys for the oil‐and-gas and construction industries in Russia and the South East Asia.

The following facilities were designed and constructed based on the data obtained by PECO: offshore stationary sleetproof oil‐producing platforms Molikpaq, Lunskaya and Orlan at the shelf of the Sea of Okhotsk; the first in Russia natural gas liquefaction plant (LNG) with associated oil shipment terminal in Prigorodnoye, Aniva Bay, Sakhalin; onshore oil shipment export terminal in DeKastri, Khabarovsk region; one of the largest on Sakhalin highway bridge via Chayvo Bay; offshore and onshore pipeline routes under Sakhalin-1, Sakhalin-2, Sakhalin-3 Projects; Sakhalin‐Khabarovsk-Vladivostok pipeline route; subsea and aboveground production complxes of Kirinskoye gas condensate field and many others.


                                               Complex onshore and offshore engineering‐geological surveys for construction of LNG Plant in the Far East of Russia, De‐Kastry, Khabarovsk region, 2016 — 2017.                                                                                    

 

Complex offshore engineering‐geological surveys (drilling of boreholes and CPT to the depth of 40 m at the water depth up to 260 m) at the sites of Kirinskoye gas condensate field subsea production complex in September‐December, 2014. The surveys were performed from SV “Trias”.

 

Complex engineering geological survey for design of underwater production plant of the Kirinskoye gas condensate field, the Sea of Okhotsk, under Sakhalin-3 Project in July through October 2010

 

Complex onshore engineering geological survey for design of the onshore technological facility of the Kirinskoye gas condensate field under Sakhalin-3 Project in February through December 2010.

 

Floating Jack — up Drilling Rig Krot Offshore geotechnical investigations for construction of bridge crossing between Vladivostok and Russkiy Island, summer 2008, East Bosporus Strait, Primorie

 

Survey vessels Trias and Igor Maximov and geophysical survey launch Yamaha. Offshore geotechnical and geophysical investigations for construction of «Sakhalin — Khabarovsk — Vladivostok» gas — main pipeline, September and October 2008, Nevelskogo Strait

Over 100 projects have been successfully performed in the Russian Far East, including projects for Mobil Russia Ventures Inc., Exxon Neftegas Limited, Sakhalin Energy Investment Co. Ltd., CJS Sakhalin Projects, Gazflot LLC, PiterGaz LLC under the international offshore projects within Piltun‐Astokhskoye, Lunskoye, Arkutun‐Dagi, Chayvo, Odoptu, Veninskoye, Mynginskoye and Kirinskoye oil‐and-gas fields.

Over 50 projects were performed in the South East Asia for such companies as Vietsovpetro, Petro‐Vietnam, Fina Exploration Minh Hai B.V., Japan‐Vietnam Petroleum Co. Ltd., Adrill Pte., Ltd. and Unocal‐Vietnam in «White Tiger», «Dragon», «Rang Dong», «Day Hung», «Man Kau» fields.

Geotechnical surveys on «Yastreb» drilling complex site for ENL, 2003.

 

Offshore geophysical survey for SPM near «Molikpaq» exploration platform for Sakhalin Energy Investment Co, July 2000.